How will Deerfoot Trail be improved in this area?

  • Operations will be improved by reconfiguring the interchange at McKnight Boulevard NE.
  • New and improved traffic signals will be installed at the ramp from northbound Deerfoot Trail to eastbound McKnight Boulevard NE.
  • Capacity will be increased on Deerfoot Trail by adding a fourth continuous lane in each direction from 32 Avenue NE to Beddington Trail NW.
Surveying works, September 2023.
Subgrade preparation works, September 2023.
Excavation works, October 2023.
Subgrade preparation works, May 2024.
Preliminary ramp construction works, May 2024.