IVOR STRONG BRIDGE




How will Deerfoot Trail be improved in this area?
- The Ivor Strong Bridge will be twinned:
- A new bridge will be constructed adjacent to the existing bridge
- Once complete, the new bridge will carry all southbound traffic and the existing bridge will carry all northbound traffic
- Areas adjacent to the bridge will have a minimum of three continuous lanes in each direction
