IVOR STRONG BRIDGE

How will Deerfoot Trail be improved in this area?

  • The Ivor Strong Bridge will be twinned:
    • A new bridge will be constructed adjacent to the existing bridge
    • Once complete, the new bridge will carry all southbound traffic and the existing bridge will carry all northbound traffic
  • Areas adjacent to the bridge will have a minimum of three continuous lanes in each direction

Cross Section

Cross sections are only representative of the location shown on the plan view. Dimensions may vary along the corridor as the ramps are not necessarily parallel with section lines.