McKNIGHT BOULEVARD NE

How will Deerfoot Trail be improved in this area?

  • Operations will be improved by reconfiguring the interchange at McKnight Boulevard NE.
  • New and improved traffic signals will be installed at the ramp from northbound Deerfoot Trail to eastbound McKnight Boulevard NE.
  • Capacity will be increased on Deerfoot Trail by adding a fourth continuous lane in each direction from 32 Avenue NE to Beddington Trail NW.

Cross Sections

Cross sections are only representative of the location shown on the plan view. Dimensions may vary along the corridor as the ramps are not necessarily parallel with section lines.